For Procurement VPs, Cost Engineers, Platform Integrators & Operating Teams

Framing:

Uncover 12% to 25% in supplier overpayments with zero spec changes or recertification delays.

Sole-source and sub-tier suppliers routinely hide behind qualification moats and outdated raw-material surcharges to inflate renewal quotes. We decompose your priority hardware into raw alloy indices, machining cycle times, special-process steps and tariff pass-throughs so your buyers negotiate from hard cost evidence without switching qualified vendors.

Modeled quote variance
12–25%

Typical gap exposed between sole-source renewal quotes and bottom-up cost models

Spec or drawing changes
Zero

Renegotiate commercial terms with your incumbent qualified vendor first

Sub-tier bottleneck map
Tier 1–4

Expose when two competing Tier-1 bidders rely on the exact same upstream forge

Scoped BOM audit sprint
15 Days

Fact packs delivered in time for contract renewal or repricing windows

Exploded precision defence turbine and high-pressure valve assembly with parametric should-cost breakdown
Illustrative component teardown: separating raw alloy, machining and special-process costs from unverified vendor surcharges.

Should-Cost & Readiness Audit Scope

Scope a 15-day BOM should-cost & bottleneck sprint

Tell us the component category, sub-assembly family or renewal deadline you are preparing for.

Open the scope request form directly

Loading inquiry form…

Can be scoped from HS codes, part families or public specifications first. Mutual NDA available for BOMs and vendor quotes.

Prefer direct email or a mutual NDA first? Email hello@15rock.com

The outcomes we enable

Three decisions your team can make immediately.

We do not sell generic industry overviews or software seats. Every engagement delivers the verified evidence, cost models and company shortlists needed to execute.

Outcome 01 · Margin Recovery

Claw back inflated material and energy surcharges without triggering recertification

Replacing a certified defence supplier can take 18 months of engineering sign-offs. Instead, we give your buyers a bottom-up parametric cost model showing where mill indices fell while vendor quotes stayed elevated.

Delivered artifact

Editable Excel should-cost model per SKU with alloy, labour, scrap and overhead drivers.

Outcome 02 · Readiness Protection

Eliminate hidden sub-tier single points of failure before they delay fleet availability

Two approved Tier-1 suppliers often buy castings, forgings or sterile electronics from the same congested Tier-3 shop. We trace upstream dependencies so you can secure capacity before delivery penalties hit.

Delivered artifact

Multi-tier dependency map flagging shared upstream chokepoints and lead-time risks.

Outcome 03 · Dual-Source Optionality

Bring a credible domestic or allied alternative bench into every negotiation

Walk into sole-source negotiations with a screened shortlist of alternative shops that already hold the required aerospace, defence or heavy-industrial certifications for that exact process family.

Delivered artifact

Screened alternative supplier matrix with documented certifications and open validation items.

Quantify the impact & inspect a sample

Model your target scenario and review an illustrative deliverable extract.

Adjust the slider below to model an illustrative scenario for your mandate, then inspect a sample table from the unlocked Excel workbook.

Interactive Outcome Value Model · Illustrative

Interactive BOM Should-Cost & Variance Estimator

Illustrative model: estimate addressable quote variance across a priority hardware or sub-assembly spend cohort.

$80M
$10M$500M

Modeled annual supplier quote variance to negotiate

$13M

Engineering recertification delay required for commercial repricing

0 months (incumbent renegotiation fact pack)

Illustrative calculation using a 16% modeled variance benchmark across specialized machining, casting and actuation categories. Actual savings depend on contract structure and negotiation.

Parametric should-cost & sub-tier audit · Actuation & valve assemblyIllustrative
Illustrative bottom-up cost breakdown and sub-tier dependency check across four production stages
Production stageModeled cost share% of unit costQuote vs. modelVariance to testUpstream supply depthNegotiation & readiness action
Stage 1 · Final assembly & pressure test24%+19% above model4 qualified integratorsChallenge assembly burden rate and pass-through markup
Stage 2 · 5-axis CNC housing machining31%+4% above model9 regional certified shopsWithin normal tolerance; benchmark setup amortization
Stage 3 · Specialty alloy closed-die forging29%+18% surchargeChokepoint · 2 domestic forgesBoth Tier-1 vendors share one forge; reserve slot capacity
Stage 4 · Nickel-chromium bar & melt index16%-11% mill index dropAllied mill indexRemove expired raw-material surcharge at renewal
Fictional assembly and figures. Demonstrates how parametric cost modelling separates raw-material movements from supplier margin expansion.
Final technical and commercial supplier qualification remains with your procurement and engineering teams.

How the engagement works

From your question to an analyst-checked workbook.

Four-step execution sequence

  1. 01Your procurement team + 15Rock

    Select the priority 25 to 50 hardware SKUs, sub-assemblies or sole-source renewal contracts to audit.

  2. 02AI research agents

    Trace upstream alloy indices, customs shipments, special-process certifications and sub-tier supplier links.

  3. 0315Rock analysts

    Build the bottom-up parametric cost stack for each SKU and flag shared Tier-2/3 capacity bottlenecks.

  4. 04Your buyers & cost engineers

    Take the unlocked Excel cost models and negotiation fact packs into vendor repricing talks.

Should-Cost & Readiness Audit Scope

Scope a 15-day BOM should-cost & bottleneck sprint

Tell us the component category, sub-assembly family or renewal deadline you are preparing for.

Open the scope request form directly

Loading inquiry form…

Can be scoped from HS codes, part families or public specifications first. Mutual NDA available for BOMs and vendor quotes.

Prefer direct email or a mutual NDA first? Email hello@15rock.com

How to start

One question, a fixed fee, a first read in days.

Your question
One live question, with the decision it serves.
What comes back
A reviewed answer with a point of view (a ranked shortlist, a diagnostic or a plan), with every source and anything unverified flagged.
The fee
The fee is fixed and agreed before work starts.
The timing
A first read in days, not weeks, then the reviewed brief on the date we agree.

We can provide regular research updates after the first project.

Frequently asked questions

Do we have to switch suppliers or re-certify parts to capture savings?

No. The primary use of a should-cost fact pack is to renegotiate commercial pricing and remove outdated material or energy surcharges with your existing, already-qualified supplier.

Do we need to share confidential blueprints on day one?

No. We can scope the engagement from part categories, material grades and approximate weight/tolerance envelopes, then review detailed drawings or quotes under a mutual NDA.

How do you uncover Tier-2 and Tier-3 bottlenecks when Tier-1 suppliers do not disclose them?

We triangulate sub-tier links using customs and bill-of-lading records, special-process certification registries, environmental permits and regional capability scans, clearly labelling confirmed versus candidate links.

How fast can we receive a fact pack before a contract renewal?

A focused component category or renewal cohort is typically scoped in a 15-minute call and delivered within a two-to-three-week sprint.

Discuss your defence scope

Preparing for a sole-source renewal or fleet readiness review?

Request a scoped BOM should-cost and sub-tier bottleneck audit before locking in multi-year supplier pricing.