Defence Primes, Platform Integrators & Portfolio Operations Teams

Uncover 12% to 25% in supplier overpayments with zero spec changes or recertification delays.

We decompose your priority hardware into raw alloy indices, machining cycle times, special-process steps and tariff pass-throughs so your buyers negotiate from hard cost evidence without switching qualified vendors.

12–25%
Modeled quote variance
Zero
Spec or drawing changes
Tier 1–4
Sub-tier bottleneck map
15 Days
Scoped BOM audit sprint

Should-Cost & Readiness Audit Scope

Scope a 15-day BOM should-cost & bottleneck sprint

Tell us the component category, sub-assembly family or renewal deadline you are preparing for.

Open the scope request form directly

Loading inquiry form…

Can be scoped from HS codes, part families or public specifications first. Mutual NDA available for BOMs and vendor quotes.

Prefer direct email or a mutual NDA first? Email hello@15rock.com

Sample Deliverable

Parametric should-cost & sub-tier audit · Actuation & valve assembly

Parametric should-cost & sub-tier audit · Actuation & valve assemblyIllustrative
Illustrative bottom-up cost breakdown and sub-tier dependency check across four production stages
Production stageModeled cost share% of unit costQuote vs. modelVariance to testUpstream supply depthNegotiation & readiness action
Stage 1 · Final assembly & pressure test24%+19% above model4 qualified integratorsChallenge assembly burden rate and pass-through markup
Stage 2 · 5-axis CNC housing machining31%+4% above model9 regional certified shopsWithin normal tolerance; benchmark setup amortization
Stage 3 · Specialty alloy closed-die forging29%+18% surchargeChokepoint · 2 domestic forgesBoth Tier-1 vendors share one forge; reserve slot capacity
Stage 4 · Nickel-chromium bar & melt index16%-11% mill index dropAllied mill indexRemove expired raw-material surcharge at renewal
Fictional assembly and figures. Demonstrates how parametric cost modelling separates raw-material movements from supplier margin expansion.
Final technical and commercial supplier qualification remains with your procurement and engineering teams.
  1. 01 · Margin Recovery

    Claw back inflated material and energy surcharges without triggering recertification

    Parametric should-cost model per SKU with alloy, labour, scrap and overhead drivers.

  2. 02 · Readiness Protection

    Eliminate hidden sub-tier single points of failure before they delay fleet availability

    Multi-tier dependency map flagging shared upstream chokepoints and lead-time risks.

  3. 03 · Dual-Source Optionality

    Bring a credible domestic or allied alternative bench into every negotiation

    Screened alternative supplier matrix with documented certifications and open validation items.

Scope & Confidentiality Questions

Do we have to switch suppliers or re-certify parts to capture savings?

No. The primary use of a should-cost fact pack is to renegotiate commercial pricing and remove outdated material or energy surcharges with your existing, already-qualified supplier.

Do we need to share confidential blueprints on day one?

No. We can scope the engagement from part categories, material grades and approximate weight/tolerance envelopes, then review detailed drawings or quotes under a mutual NDA.

How do you uncover Tier-2 and Tier-3 bottlenecks when Tier-1 suppliers do not disclose them?

We triangulate sub-tier links using customs and bill-of-lading records, special-process certification registries, environmental permits and regional capability scans, clearly labelling confirmed versus candidate links.

How fast can we receive a fact pack before a contract renewal?

A focused component category or renewal cohort is typically scoped in a 15-minute call and delivered within a two-to-three-week sprint.

02 · Should-Cost & Fleet Readiness

Preparing for a sole-source renewal or fleet readiness review?

Request a scoped BOM should-cost and sub-tier bottleneck audit before locking in multi-year supplier pricing.

Can be scoped from HS codes, part families or public specifications first. Mutual NDA available for BOMs and vendor quotes. Email hello@15rock.com

  1. 01

    Your procurement team + 15Rock

    Select the priority 25 to 50 hardware SKUs, sub-assemblies or sole-source renewal contracts to audit.

  2. 02

    AI research agents

    Trace upstream alloy indices, customs shipments, special-process certifications and sub-tier supplier links.

  3. 03

    15Rock analysts

    Build the bottom-up parametric cost stack for each SKU and flag shared Tier-2/3 capacity bottlenecks.

  4. 04

    Your buyers & cost engineers

    Take the sourced cost models and negotiation fact packs into vendor repricing talks.