Finding $22M in component markups with zero spec changes
- The challenge
- An industrial operator faced persistent vendor price increases across machined housings, injection-moulded plastics, stamped brackets and wire harnesses, but could not alter engineering specs without triggering re-certification.
- What we did
- Built 4-layer parametric should-cost models across 5 anchor SKU families—auditing raw-material weight net of closed-loop swarf scrap credits, spindle cycle times, and cumulative shipments against original mould and die capex.
- The result
- 14–23% unit-cost cut from paid-off tooling and uncredited scrap, with zero buyer capex.