Skip to main content
Defence & Aerospace · Interactive Diagnostic

Defence Readiness & Sub-Tier Bottleneck Workbench.

Select your operational role or run a 2-minute bottleneck diagnostic to see why conventional NAICS directories, ERP spend cubes, and generic AI break at Tier-2 and Tier-3—and open the exact 15Rock Review teardowns built for your decision.

Delivered defence & dual-use scans
32+
Verified sub-tier suppliers graphed
2,100+
Sub-tier plants hidden by NAICS
88.4%
Historical Vote-5 capital lapse mean
35.4%
Modeled naval ISS readiness bridge
59.6% → 75%
Pre-RFP signal lead-time window
10 Months
Select Your Operational Role
Role 01 · Shipyards & Domestic PrimesVP Supply Chain, Chief Procurement Officer & ISS Program Directors

Fleet availability trails the 75% target while sole-source suppliers demand 30%+ price hikes

59.6% → 75%

Modeled forward naval readiness bridge (+C$35M/yr ISS efficiency)

The Operational Bottleneck

Across multi-decade naval shipbuilding and In-Service Support (ISS) programs, 62% of spares-related vessel downtime traces back to 18 long-lead sub-tier valves, shaft seals, chillers, and switchgear—while Tier-2 fabricators bill blanket 28% alloy scrap rates.

Why Tier-1 ERP spend cubes and macro advisory decks fail

ERP spend cubes stop at Tier-1 invoicing and cannot see whether three competing Tier-1 integrators rely on the same single-furnace Tier-3 forging house. Without bottom-up CAD nesting and CNC spindle-hour physics, buyers cannot challenge a 32% sole-source price hike.

How 15Rock Solves It · Parametric Physics Clean-Sheeting & Nuclear Second-Sourcing
  1. 01Physics Should-Cost Bridge: Deconstruct top 50–250 BOM SKUs into finished CAD part weight vs. gross alloy billet, true 14.2% nesting scrap, and deterministic 5-axis spindle hours.
  2. 02Civil Nuclear Cross-Walk: Query 15Rock's industrial graph for 14 domestic ASME Section III / CSA N285 nuclear and severe-service energy shops to qualify alternate sources.
  3. 03Rotable NSN Scrub: Reconcile duplicate NATO Stock Numbers across coastal depots and link safety stock to sub-tier lead-time variance.

Anonymized Benchmark from Delivered Work

Following DND's observed fleet serviceability recovery from 45.73% (FY23–24) to 59.6% (FY24–25), modeled a +15.4-point forward availability bridge toward the 75.0% target via 14 domestic nuclear/energy alternate shops (protecting C$104M–C$260M in cumulative 35-year lifecycle fee-at-risk on a C$5.2B ISS program), plus a 535 bps (US$143.6M / C$194M direct COGS; C$329M combined with C$135M SG&A) margin bridge across a US$2.68B structural platform.

Executive Verification Checklist
  • Isolate the exact 18 sub-tier mechanical/electrical assemblies driving 62% of spares-related platform downtime.
  • Require suppliers to unbundle raw mill alloy index pass-throughs from conversion spindle hours.
  • Cap NADCAP NDT, heat-treatment, and hydro-testing charges as fixed lot fees rather than percentage adders.
  • Cross-qualify 14 domestic civil nuclear (ASME Section III / CSA N285) fabricators against foreign single-source naval valves and heat exchangers.

Start with one question

Ready to scope a sub-tier diagnostic, ITB bench, or pre-LOI diligence read?

Start with one live question at a fixed fee. You receive a first read in days, followed by the analyst-checked brief and unlocked Excel workbook.

Discuss your project